Projects

Underground mine at a lead-zinc deposit, Kazakhstan
Reserve Estimation (KazRC)
Kyzylorda region
Project
2025
Lead-zinc deposit. Underground mine.
4 million tonnes of ore per year
Combined mining at a gold deposit, Pre-Feasibility Study, Kazakhstan
Pre-Feasibility study
Zhambyl region
Project
2026
Gold deposits. Combined mining.
800,000 tonnes of ore per year.
Solid Waste Processing and Glass Container Production Plant, working design, Kazakhstan
Working Project
Kyzylorda region
Project
2026
Solid waste processing plant (cullet) for glass container production.
Capacity: 240 million units per year (280 tonnes of glass mass per day).
Gold recovery plant at a gold deposit, project stage, Kazakhstan
Project Stage
Karaganda region
Project
2026
Gold deposit. Gold extraction plant.
1.7 million tonnes of ore per year.
Detailed Design
East Kazakhstan
Project
2026
Detailed Design for Materials and Equipment Warehouses No. 1 and No. 2 of the Underground Mine
Gold
Research and Development
Aktobe Region
Project
2026
Development of Metallurgical Testing and Process Flowsheet for Iron Ore Wet Magnetic Separation
Drilling Supervision
Zhambyl Region
Project
2026
Geological, geotechnical, and hydrogeological drilling support: supervision, QA/QC, testing, analysis
Detailed Design
Aktobe region
Project
2026
Underground mine. Capacity of 7 million tonnes of ore per year. Detailed design documentation: Charging station, passing bay (passing drift), support/lining of ore passes and waste passes, shotcrete mix receiving chambers, etc.
Investment Advisory & Support
Kazakhstan
Project
2025
Audit and analysis of assets (deposits) for potential acquisition

Some images on this page were edited/generated using AI

Scroll to Top