Projects

Copper deposit, Underground mine, Kazakhstan
Mine plan
Karaganda region
Project
2024
Copper deposit. Underground mine.
840,000 tonnes of ore per year
3D modeling of the mine plan using Deswik software
Mine plan
Aktobe region
JSC KazGEORUD
2024
Gopper deposit. Open-pit mine.
2 million tonnes of ore per year.
Iron ore quarry, Kazakhstan
Mine plan
Kostanay region
JSC SSGPO
2025
Iron ore deposit. Open-pit mine.
26 million tonnes of ore per year.
Drilling program, geological exploration of the field, Kazakhstan
Mine plan
Aktobe region
JSC TNK KAZCHROME
Chromite deposit. Underground mine.
7 million tonnes of ore per year.
TEC engineers at a production facility, mining engineering
Working Documentation
Aktobe region
JSC TNK KAZCHROME
Chromite deposit. Underground mine.
7 million tonnes of ore per year. Loading and unloading chamber.
Complex for the production and transfer of shotcrete mixture at a chrome deposit, Kazakhstan
Design and Working Documentation
Aktobe region
JSC TNK KAZCHROME
Chromite deposit. Shotcrete mix production and transfer complex.
Capacity: 35 m³/hour.
Mine working support, anchoring, shotcrete
Research Work
Aktobe region
JSC TNK KAZCHROME
Chromite deposit. Development of optimal ore-pass lining technology designs.
Customized tunnel boring machine, underground construction
Research Work
Aktobe region
JSC TNK KAZCHROME
Chromite deposit. Technological regulations for sinking and lining of vertical mine workings.
Gold mine open pit, transition to underground mining, Akmola region
Consulting
Akmola region
Fluor
Gold deposit. Transition to underground mining.
2 million tonnes of ore per year. Pre-Feasibility Study development support.